Continuity& Resilience
Pricing
Sign in
← Glossary
IT continuity

IT disaster recovery plan

PRA / DRP

In French : Plan de reprise d'activité informatique

A plan describing the restoration of information systems at a recovery site or infrastructure. It is a component of the continuity arrangements, not their equivalent.

Source : NIST SP 800-34 Rev. 1

Related terms

Recovery time objective

The period of time within which an activity, product or service must be resumed after disruption, and the associated resources restored.

Recovery point objective

The volume of data, expressed in time, that the organisation accepts losing during a disruption. A four-hour RPO means the last four hours of input may be lost.

Alternate site

A site intended to host operations when the primary site is unavailable. Classified as cold, warm, hot or mirrored according to its readiness.

ICT readiness for business continuity

The capability of information systems to support business continuity, covering detection, response and recovery — not just technical restoration.

Continuity & Resilience

Training, standards and certifications in business continuity and operational resilience.

Get our analyses

One analysis a month on continuity practice and European regulation. No advertising.

Learn

  • Tracks
  • Courses
  • Certifications
  • Pricing

Reference

  • Standards
  • Glossary
  • Insights

Practise

  • Toolkit
  • Diagnostic
  • Verify a certificate

The company

  • About
  • Contact
  • Legal notice

Our other sites

  • regulation-dora.euThe DORA regulation, article by article
  • regulation-ai.euThe EU AI Act
  • resiplan.euBusiness continuity management software

Independence

Continuity & Resilience is an independent publisher. The certifications issued here are specific to the platform and do not substitute for those of ISO, the BCI or DRI.

© 2026 Continuity & Resilience. All rights reserved.