Restoration test procedure
Five test levels, timestamped chronology, gap exploitation.
The procedure requires measuring six items separately: detection, decision, technical preparation, restoration, verification, reopening. The "technical preparation" item — often 20 to 30% of the total — appears in almost no plan and is the one that surprises most.
How to use it
- Time it, do not merely confirm it
- Compare year on year
- Convert every gap above 30% into an action