Toolkit
TPL-122PlanThird-party risk

Provider exit plan

Four verifiable elements, including a tested data extraction.

Identified fallback provider, documented and tested extraction format, migration plan with durations, degraded mode during the transition. Includes the exit cost estimate — reversibility fees, migration, parallel running, lost productivity — to be established before signature.

How to use it

  • Test the data extraction once a year
  • Distinguish a planned exit from an abrupt failure
  • Cost the exit before signature

Courses that use it

Related templates